
Wisma Dayamas Sdn. Bhd. (GSD Land)
D' Starlingtton
Teluk Kumbar
From
RM 486K
RM 378β486 PSF Β· Completion 2026
Tenure
freehold
Title
TBC
Total Units
820
Completion
2026
- From
- RM 486K
- PSF
- RM 378β486
- Tenure
- freehold
- Total units
- 820
- Status
- under construction
- Completion
- 2026
Price at a glance
Prices as at September 2026 β Developer prices basis. Last checked 2026-07-31. The project has not completed β no resale market yet.
| Unit type | Size (sqft) | Price from | PSF from |
|---|---|---|---|
| 3BR (Type A) | 1,076 | RM486,000 | ~RM452 |
| 3BR (Type B) | 1,001 | RM486,000 | ~RM486 |
| 3BR (Type C) | 1,044 | RM486,000 | ~RM466 |
Project Tracking
We're tracking D' Starlingtton β not yet personally reviewed by Zac
This project is in our database from public sources (4 sources) from Wisma Dayamas Sdn. Bhd. (GSD Land). Full pricing, floor plans, unit availability and Zac's honest take are available on direct request β most developers update pricing weekly and we share the current numbers immediately.
- π Latest price list & available unit types
- ποΈ Current construction stage and photos
- π¬ Zac's honest assessment for your situation
- π Direct introduction to the developer if you want to view
D' Starlingtton price list 2026
3 of 4 unit types have a published price Β· entry from RM486,000 Β· 328 of 820 units listed Β· completing 2026
| Type | Size (sqft) | Price from | PSF (derived) | Units |
|---|---|---|---|---|
| 3BR (Type A) | 1,076 | RM486,000 | ~452 | 104 |
| 3BR (Type B) | 1,001 | RM486,000 | ~486 | 104 |
| 3BR (Type C) | 1,044 | RM486,000 | ~466 | 92 |
| 4BR Duplex (Type E) | 1,647β1,733 | On application | β | 28 |
PSF is derived, not quoted β each row divides that type's price by its own square footage. Developers do not always state whether a published size is built-up or nett, and the two can differ by 20%. Ask for both in writing before you sign.
Developer price β the project has not completed, so there is no resale market to compare against, last checked 2026-07-31. Developers reprice between phases β confirm the current list before committing.
No published unit type clears the RM1M foreign-buyer minimum, but one type is priced on application β those may qualify. Ask before ruling the project out.
4BR Duplex (Type E) is priced on application
Usually the penthouses and duplexes β developers hold those back rather than publish them. I can get you the current figure and the floor plan directly.
π² Ask for the current price listD' Starlingtton completion date
D' Starlingtton is expected to complete in 2026. It is under construction now.
Read that as the developer's target, not a guarantee. What matters contractually is the vacant possession date in your SPA β 36 months from the sale and purchase agreement for a strata title under the Housing Development Act, with liquidated damages payable if the developer misses it. A launch year quoted in marketing and the VP date you can enforce are different things, so check the SPA schedule before you plan a move-in or a tenancy.
Building specifications
- Blocks
- 2
- Floors
- 29
- Total units
- 820
Facilities
What's nearby
π Shopping
- Queensbay Mall7.0km
Monthly Instalment Calculator
Monthly Instalment
RM 1,963
Total Interest
RM 387,068
Total Outlay
RM 873,068
Estimates only β not an offer, quotation, or representation of the developer's actual pricing or package. Actual instalments depend on the bank's approved rate, tenure and margin of financing.
π² Discuss financing options with ZacOther projects in teluk kumbar
All 6 others we track here, cheapest first β 2 of them still selling.
- D'Tiara ResidenceRM300K
- Laguna Bay ResidencesRM300K
- Ramah PavilionRM395K
- Emerald ResidenceRM420K
- M Tree Hill CondominiumRM895K
- One Tree Hill ResidenceRM980K
Teluk Kumbar β area snapshot
Full area guide βPrice range
RM 300K β RM 980K
asking prices in area
Active projects
2
selling or under construction
Subsale condos
4
completed projects
Total tracked
7
properties in this area
Total Cost Breakdown
Every cost you'll pay β stamp duty, legal fees, loan documentation, foreign levy. Real Penang numbers, not generic Malaysia estimates.
| Downpayment | RM 48,600 |
| SPA stamp duty (tiered 1β4%) | RM 8,720 |
| SPA legal fee | RM 6,075 |
| MOT stamp duty (at VP) Tiered 1β4% on transfer value. Paid at Vacant Possession stage. Buyer's cost β rarely absorbed by developer. | RM 8,720 |
| Loan stamp duty (0.5%) | RM 2,187 |
| Loan agreement legal fee | RM 2,187 |
| Valuation fee | RM 1,000 |
| Search, admin, misc | RM 1,000 |
| Gross upfront total | RM 78,489 |
New launch β typical developer savings
Toggle what the developer is absorbing. Confirm the actual package before signing.
Net upfront (after savings)
Based on typical 2026 new launch package
Estimates only, based on 2026 Penang state rules β not an offer, quotation, or representation of the developer's actual package. Actual costs vary by bank, lawyer, and case complexity. Confirm exact figures with Zac β
Frequently asked questions
What is the tenure of D' Starlingtton?
+
How many units are in D' Starlingtton?
+
When is D' Starlingtton completing?
+
What is the starting price?
+
Substitutes worth comparing
Open full comparison βSame area family, same property type, similar price band β what most buyers actually cross-shop.
From
RM 486K
D' Starlingtton