penangproperty
STARK Tower — serviced apartment, The Light Waterfront, Gelugor
New LaunchfreeholdcommercialEst. 2028

Stark Development Sdn Bhd

STARK Tower

The Light Waterfront, Gelugor

From

RM 700K

Completion 2028

Tenure

freehold

Title

commercial

Total Units

624

Completion

2028

From
RM 700K
PSF
—
Tenure
freehold
Total units
624
Status
under construction
Completion
2028

Price at a glance

Prices as at November 2026 — Developer prices basis. Last checked 2026-10-10. The project has not completed — no resale market yet.

Unit typeSize (sqft)Price fromPSF from
All units425–640RM700,000~RM1,647
Z

Zac’s Take

Zac Ong

STARK Tower is a 34-storey freehold tower of serviced suites by Stark Development on a 2.3-acre site at The Light Waterfront in Gelugor, with 624 suites and 24 commercial units, due in 2028.

Suites are compact, about 425 to 640 sq ft, priced from about RM700,000, roughly RM1,210 to RM1,230 per sq ft. The convention centre, the Mutiara Line's Penang Waterfront station and the bridge are all close by.

It's built for investors rather than families. The developer's marketing talks about short-stay returns, but on the island that needs the owners' 75% vote and a council licence after handover, so plan on long-term rent first. Prices sit below the RM1M foreign-buyer minimum, so it's for Malaysians, PRs and MM2H participants from RM500,000.

STARK Tower price list 2026

0 of 1 unit types have a published price · 624 units total · completing 2028

TypeSize (sqft)Price fromPSF (derived)Units
Suite425–640On application—624

PSF is derived, not quoted — each row divides that type's price by its own square footage. Developers do not always state whether a published size is built-up or nett, and the two can differ by 20%. Ask for both in writing before you sign.

Developer price — the project has not completed, so there is no resale market to compare against, last checked 2026-10-10. Developers reprice between phases — confirm the current list before committing.

No published unit type clears the RM1M foreign-buyer minimum, but one type is priced on application — those may qualify. Ask before ruling the project out.

Suite is priced on application

Usually the penthouses and duplexes — developers hold those back rather than publish them. I can get you the current figure and the floor plan directly.

📲 Ask for the current price list

STARK Tower completion date

STARK Tower is expected to complete in 2028. It is under construction now.

Read that as the developer's target, not a guarantee. What matters contractually is the vacant possession date in your SPA — 36 months from the sale and purchase agreement for a strata title under the Housing Development Act, with liquidated damages payable if the developer misses it. A launch year quoted in marketing and the VP date you can enforce are different things, so check the SPA schedule before you plan a move-in or a tenancy.

Building specifications

Blocks
1
Floors
34
Total units
624

Facilities

Infinity Sky PoolJacuzziGymnasiumIndoor Spinning RoomPilates StudioMartial Arts StudioFine Dining RestaurantsWhisky Jazz BarHelipadConciergeHousekeeping

What's nearby

🏥 Healthcare

  • Penang General Hospital
  • Loh Guan Lye Specialist Centre

🎓 Schools

  • Universiti Sains Malaysia (USM)
  • Han Chiang High School
  • SMK Bukit Gambir

🛍 Shopping

  • The Light Shopping Mall
  • Queensbay Mall
  • Sunshine Square Bayan Baru
  • Gurney Plaza

Monthly Instalment Calculator

Monthly Instalment

RM 2,827

Total Interest

RM 557,506

Total Outlay

RM 1,257,506

Estimates only — not an offer, quotation, or representation of the developer's actual pricing or package. Actual instalments depend on the bank's approved rate, tenure and margin of financing.

📲 Discuss financing options with Zac

Other projects in gelugor

All 16 others we track here, cheapest first — 5 of them still selling.

Gelugor — area snapshot

Full area guide →

Gelugor is a central island location close to USM and the Light Waterfront. Infrastructure is established, and The Light Waterfront development has lifted profile significantly.

Price range

RM 565K – RM 2.0M

asking prices in area

Active projects

5

selling or under construction

Subsale condos

11

completed projects

Total tracked

17

properties in this area

Total Cost Breakdown

Every cost you'll pay — stamp duty, legal fees, loan documentation, foreign levy. Real Penang numbers, not generic Malaysia estimates.

DownpaymentRM 70,000
SPA stamp duty (tiered 1–4%)RM 15,000
SPA legal feeRM 8,250
MOT stamp duty (at VP)

Tiered 1–4% on transfer value. Paid at Vacant Possession stage. Buyer's cost — rarely absorbed by developer.

RM 15,000
Loan stamp duty (0.5%)RM 3,150
Loan agreement legal feeRM 3,150
Valuation feeRM 2,000
Search, admin, miscRM 1,000
Gross upfront totalRM 117,550

New launch — typical developer savings

Toggle what the developer is absorbing. Confirm the actual package before signing.

Cash rebate3% = RM 21,000
0%5%10%
Total developer savings− RM 35,550

Net upfront (after savings)

Based on typical 2026 new launch package

RM 82,000

Estimates only, based on 2026 Penang state rules — not an offer, quotation, or representation of the developer's actual package. Actual costs vary by bank, lawyer, and case complexity. Confirm exact figures with Zac →

Frequently asked questions

What is the price of STARK Tower?

+
STARK Tower runs RM700,000 and up. That is the developer's price. The project has not completed, so there is no resale market to compare against yet. Checked 2026-10-10.

Is STARK Tower freehold or leasehold?

+
STARK Tower is freehold, on a commercial title. Those are two separate facts and only the first usually appears in marketing. A commercial title means commercial utility and assessment tariffs, and a tighter loan margin at most banks.

Can a foreigner buy at STARK Tower?

+
Possibly, on the larger units. Penang Island sets a RM1,000,000 minimum for foreign buyers of strata property, and the entry price is below it; ask for the price of the specific unit before you plan around it. Add the state levy, a flat 8% stamp duty, and 3–4 months for state consent.

When will STARK Tower be completed?

+
STARK Tower is expected to be completed in 2028, by Stark Development Sdn Bhd. That's the developer's target. The date that counts is the handover date in your sale agreement, which under Malaysian housing law is usually 36 months from signing.

How big are the homes at STARK Tower?

+
Homes range from about 425 to 640 sq ft. There are 624 homes in total.

Are short-term rentals allowed at STARK Tower Penang?

+
STR rules vary across The Light master-plan buildings — some restrict it. Confirm in writing with the developer and via the proposed building by-laws before buying if STR is your investment case.

Substitutes worth comparing

Open full comparison →

Same area family, same property type, similar price band — what most buyers actually cross-shop.

From

RM 700K

STARK Tower

Chat with Zac now