Upcoming Penang Projects 2026-2030 — The Full Pipeline, Honestly Curated

The full Penang new-launch and upcoming pipeline 2026-2030: 89 projects by completion year, entry price, tenure, layout, and honest fit. Curated by Zac Ong REN 64593.

15 September 2026· 12 min read· By Zac Ong
WhatsApp
Upcoming Penang Property Projects 2026-2030 — 89 new launches and under-construction developments across Penang Island and mainland | Penang Property by Zac Ong

Penang has 89 upcoming projects between 2026 and 2030, and the vast majority of the marketing you'll see about them is written to sell. This piece is my curated read on that pipeline — not the developer brochure version, and not a listicle either. Which projects matter for which buyer, what the honest catches are, and where the specific-buyer decision points sit across the five-year window. All figures are from my project records as of September 2026 and are verified against developer materials plus portal listings; construction dates carry the usual Malaysian slippage risk of 6-18 months and I flag where that matters.

Key takeaways:

  • 89 upcoming projects tracked across Penang Island + mainland, 2026-2030 completion
  • Price range spans about RM200K (The Skyline) to RM3.3M and well beyond (Jesselton Courtyard) — genuine range across every buyer segment
  • The 2028–early 2029 tranche is the highest-quality mix on the island — Lightwater, W Residence Gurney Bay, Merione Grand, Waterstone
  • Batu Kawan and Bayan Lepas dominate mainland + southern-island volume; northern GTA (Tanjung Tokong, Gurney, Pulau Tikus, Batu Ferringhi) dominates premium
  • Foreign-eligible stock (RM1M+) sits in a shorter list than the total pipeline suggests — most 2026-2030 launches are Malaysian-only at entry price
  • Completion slippage is normal — expect 6-18 months beyond developer target on strata towers

Want a matched shortlist for your budget and purpose? WhatsApp me — I'll filter the pipeline to what actually fits within business hours.

How to read the pipeline

Three things worth knowing before we look at specific projects:

The 2026 tranche is largely "finishing," not "launching." Most 2026-completion projects launched 2022-2023 and are now at defect-liability or handover stage. Buying into a 2026-completion project today usually means buying a leftover unit or an early subsale — not a fresh new launch. The economics are different from a 2028-2030 forward buy.

The 2028-2029 tranche is where the current new-launch action is. IJM's Lightwater, VST's W Residence Gurney Bay, BSG's Waterstone, Chin Hin's Crown Penang, and UDA's Eight & Eight are all in active preview / booking phase in Q3 2026. This is the window where developer pricing is soft, unit selection is deep, and the eventual completion + first-owner resale bumps still lie ahead.

The 2030+ tranche is speculative — pricing is developer-target only, completion risk is highest, and buyer commitment is longest. Cantonment Residence in Pulau Tikus at RM2.6M is the flagship in this bucket, aimed at buyers who can wait four years for the area's next Pulau Tikus premium address.

Year 2026 — 25 projects, mostly finishing

The 2026 tranche is dominated by mainland volume product. On the island, three names worth noting:

  • Maritime Signature (Jelutong / Karpal Singh Drive) — Bionic Land's 232-unit, 47-storey leasehold-commercial serviced apartment, from RM500K. The sea view and Karpal Singh location are genuine; the leasehold-commercial pair is the catch — Malaysian buyers only at entry, and a 99-year clock plus commercial tariff.
  • Alton Skyvillas (Jelutong) — Dutamas Permai's freehold 161-unit tower, from RM899K, sizes 1,132-2,672 sqft. Family-tier entry at meaningful floor plate; foreign-eligible on the larger units.
  • Setia Suria and Amansara North (Kepala Batas) — SP Setia's township-scale entry products, from RM430K, freehold. Mainland long-hold plays, not island premium.

Mainland volume: Ceria @ Eco Horizon (Batu Kawan, 1,302 units, from about RM444K), The Rimbun (Bukit Mertajam, 664 units, RM400K), Montview Residences (Machang Bubok, 580 units, RM372K), Emeri Place (Nibong Tebal, 18-unit boutique landed, RM1.39M). These serve owner-occupiers and first-home buyers on the mainland; the island's foreign-buyer conversation is not really the 2026 tranche.

Year 2027 — 21 projects, mid-pipeline mix

The 2027 tranche is where the first notable foreign-eligible island projects sit:

  • Lumina Residence (Georgetown fringe, VST + BSG JV) — freehold 596-unit tower, from RM1.03M, sizes 1,206-1,518 sqft. The area's cleanest MM2H property-leg fit: the RM1M threshold is right at entry, and title is residential-freehold. My default recommendation for foreign buyers wanting a Georgetown-edge new launch.
  • SENZE @ PICC (Bayan Lepas, Hunza) — freehold 1,680-unit mega-tower, from RM705K, sizes 657-2,142 sqft. Tech-area commuter product; foreign-eligible only on the RM1M+ layouts, mainly of interest to Bayan Lepas FIZ engineer buyers or landlords.
  • Arica @ Andaman Island (Tanjung Tokong, Eastern & Oriental) — freehold 380 units, from RM800K, 947-1,259 sqft. E&O's Andaman precinct entry-tier product; northern GTA branded address at accessible island ticket.
  • Queens Residences Q3 (Queensbay, Ideal) — freehold 532 units, from RM980K, 950-1,400 sqft. Queensbay Mall-adjacent, right at the foreign-buyer threshold.

Mainland: Ion Vivace (Batu Kawan, RM308K, commercial-HDA — Malaysian-only entry), Versa (Batu Kawan, RM350K, 980 units), Ari Mellizo (Butterworth, RM250K, 357 units), Aralia Park @ Pearl City (Simpang Ampat, RM430K).

Year 2028 — 24 projects, the strongest island vintage

If you asked me which single completion year of the current pipeline has the highest quality mix of island premium stock, I'd say 2028. The projects that make that case:

  • Lightwater Residences (Gelugor / The Light City, IJM Perennial) — freehold 262 units, from RM2.05M, sizes 1,152-3,186 sqft. IJM's flagship residential product inside the mall + convention centre + hotel precinct — The Waterfront Shoppes opens Oct 29 2026 so the completion-year amenity story is largely already known at signing.
  • W Residence Gurney Bay (Gurney Drive, VST Group + Marriott W licensing) — freehold residential land title (rare in the branded tier), 498 units, from RM2.37M, sizes 1,033-3,670 sqft. The Marriott W's design-forward tier on Gurney Drive with the cleanest legal setup of any branded Penang residence.
  • Merione Grand (Gelugor / The Light City, IJM Land) — freehold 93-unit commercial component, from RM693K, sizes 635-1,916 sqft. Reached 100% commercial take-up September 2026; the accessible-tier IJM Light City product for buyers open to commercial title.
  • Waterstone (Tanjung Bungah, BSG Property) — freehold 365 units, from RM1.29M, 1,334-2,195 sqft. BSG's Tanjung Bungah premium new launch, foreign-eligible from entry, sensibly-sized layouts.
  • Jesselton Courtyard (Penang Turf Club, Berjaya Land) — freehold, gated, 239 homes: 207 Courtyard Villas from about RM3.32M and 32 zero-lot bungalows from about RM8.11M, 2,734-9,053 sqft. The pipeline's ceiling in ticket and layout.
  • W Residence's neighbours — 8 Gurney legacy stock, Marriott Residences (completed 2023), Setia V (also 2028 target) — round out Gurney's 2028 delivery cluster.

Mainland 2028: Embun Hills (Bukit Mertajam, 566 homes, RM803K), Grains Residences (Bukit Mertajam, from about RM283,500, commercial-HDA), Altus Residency (Prai, RM736K). On the island, The Pier in Bayan Mutiara (934 units, RM600K) also targets 2028.

Year 2029 — 9 projects, thinner but sharpened

  • Crown Penang (Tanjung Tokong, Chin Hin Group) — freehold 588 units, from RM704K, sizes 614-1,851 sqft. Chin Hin's Tanjung Tokong branded entry; the mid-tier northern-area foreign-eligible option on the larger layouts.
  • Eight & Eight (Tanjung Tokong, UDA Land) — leasehold 600 units, from RM691K, sizes 885-1,140 sqft. UDA's Tanjung Tokong tower; leasehold is the catch — different loan margin, lease-clock consideration on hold.
  • Merione Residences (Gelugor, IJM Land) — freehold 145 units, from RM1.58M, sizes 1,055-1,206 sqft. Sept 2026 launch confirmed 5 units per floor across 29 residential levels — the accessible new-launch entry into The Light City precinct.
  • M Zenni (Batu Maung, Mah Sing) — freehold 494 units, from about RM531K, sizes 688-1,184 sqft. Mah Sing's Bayan Lepas-adjacent product; tech-area commuter fit.
  • Mezon @ Park Enclave (Batu Kawan, Aspen Group) — freehold 602 units, sizes 862-1,410 sqft. Aspen's mid-tier Batu Kawan product.
  • SkyWorld PearlMont (Seberang Jaya, SkyWorld) — freehold 1,846 units, from RM338K. The pipeline's highest unit count — mainland volume anchor.

Year 2030+ — 6 projects, developer-target only

  • Cantonment Residence (Pulau Tikus, BSG + VST JV) — freehold 128 units, from RM2.6M, sizes 2,009-4,540 sqft. The area's flagship 2030-target premium address; buyers with patience and a Pulau Tikus area preference.
  • Setia SV2 (Jelutong, SP Setia) — freehold 268 units, from RM969K, sizes 1,087-1,647 sqft. SP Setia's Jelutong follow-through — mid-tier freehold family stock.
  • Pinnacle Bukit Gambier (Bukit Gambier) — freehold 982 units, from RM589K, sizes 1,077-1,734 sqft. Bukit Gambier volume family product.
  • Keeperz Suites (Gelugor, Exsim) — freehold 493 units, from RM844K, 484-581 sqft. Compact serviced-apartment format; investor-tenor product.
  • Forescape @ Metrioplace (Batu Kawan) — freehold 398 units, from RM498K.
  • Clarissa Residences @ Tropicana Cenang (Langkawi Cenang) — freehold 806 units, from RM669K. Not Penang but included where a Penang MM2H buyer is diversifying north.

Quick comparison — the top island-premium picks

ProjectAreaCompletionTenureFromSizesBest-fit
Lumina ResidenceGeorgetown edge2027FreeholdRM1.03M1,206-1,518MM2H Gold at threshold
Lightwater ResidencesGelugor / Light City2029FreeholdRM2.05M1,152-3,186Precinct flagship, wealthy
W Residence Gurney BayGurney Drive2028Freehold (res)RM2.37M1,033-3,670Branded residence, wealthy foreign buyers
Merione GrandGelugor / Light City2028Freehold (comm)RM693K635-1,916Accessible commercial, mall-adjacent
WaterstoneTanjung Bungah2028FreeholdRM1.29M1,334-2,195Northern coast foreign-eligible
Jesselton CourtyardPenang Turf Club2028Freehold~RM3.32M2,734-9,053Gated villas and bungalows
Crown PenangTanjung Tokong2029FreeholdRM704K614-1,851Mid-tier northern coast
Merione ResidencesGelugor / Light City2029FreeholdRM1.58M1,055-1,206Accessible precinct residential
Cantonment ResidencePulau Tikus2030FreeholdRM2.6M2,009-4,540Long-hold Pulau Tikus flagship
Arica @ Andaman IslandTanjung Tokong2027FreeholdRM800K947-1,259E&O precinct entry

How to actually buy from this pipeline — three scenarios

Scenario 1: You want the near-term completion and can live with picked-over inventory. Look at the 2026-2027 tranche. Best value is usually a leftover unit at soft asking, or a very-early subsale from an original buyer who never intended to move in. Lumina Residence and Alton Skyvillas are the strongest picks in this bucket. Downside is that the amenity, resident mix, and neighbourhood character are already largely determined — you're buying into a known outcome, not a story.

Scenario 2: You want early-bird pricing on premium stock and can wait 2-4 years. This is the 2028-2029 window. Lightwater Residences, W Residence Gurney Bay, Waterstone, Cantonment Residence — all still have soft or negotiable developer pricing, deep unit selection, and pre-completion payment schedules that stretch cash flow. Downside is construction risk (slippage, developer solvency, market conditions at completion) and the natural anxiety of not seeing the finished product before signing. Balance the discount you're capturing against the risk you're taking.

Scenario 3: You want long-hold scarcity and don't mind maximum wait. The 2030+ tranche. Cantonment Residence at Pulau Tikus is the flagship. You're paying full ticket for the developer's floor pricing but capturing 4-5 years of amenity + area development lead time. Best for wealthy buyers with a genuine 15-25 year hold horizon who value future-precinct stakes over immediate delivery.

The catch on any published Penang pipeline

1. Developer target completion dates are optimistic by 6-18 months on average. A "2028 target" in September 2026 has a 70%+ probability of delivering in H1 2029 in my experience — occasionally faster, more often slower. Cash-flow model your own timeline with a 12-month buffer.

2. "From" pricing is the smallest layout at the least-desirable stack. The pipeline entry price shown here is the marketing floor. What you'll actually pay for a decent floor and orientation is usually noticeably above that number. Ask about the unit you want, not the marketing entry.

3. Foreign-eligible does not mean foreign-optimal. Every project I've flagged as foreign-eligible clears the RM1M floor at entry, but the exact unit for foreign buyers is usually not the entry unit — it's typically 1-2 tiers up where the ticket clears the floor with margin and the layout doesn't force you into the smallest stack. Filter to real listings, not to marketing.

Z

Zac’s Take

Zac Ong

The 89-project 2026-2030 Penang pipeline is 60% mainland volume, 30% Bayan Lepas / Batu Kawan mid-tier, and only about 10% premium northern-island stock. Foreign-eligible entries at RM1M+ number roughly 15-20 projects across the whole window — the shorter list than most buyers realise. Best current picks by buyer profile: MM2H Gold minimum-stretch → Lumina Residence (2027); wealthy foreign buyers branded → W Residence Gurney Bay (2028); Light City precinct → Lightwater Residences (early 2029) or Merione Residences (late 2029) accessible; long-hold Pulau Tikus → Cantonment Residence (2030). Complete pipeline shortlist matched to your specific budget + purpose is a WhatsApp conversation away.

The next step

Send me your budget ceiling, target purpose (own-stay / MM2H property leg / rental yield / long-hold capital preservation) and preferred completion horizon (2027, 2028-29, or 2030+). WhatsApp me here and I'll come back with the 3-5 pipeline picks that actually fit — plus current developer pricing and available unit selection where relevant.

Area context if you're still zooming out: Gurney Drive 2026, Tanjung Tokong 2026, Pulau Tikus 2026, Batu Ferringhi 2026, Gelugor 2026. For the foreign-buyer costs, see the foreign buyer guide; for MM2H sequencing, the MM2H 2026 property buying playbook.


Sources: Project specifications, developer names, tenure, land title, unit counts, layout sizes, entry pricing and completion targets from developer material, cross-verified against developer materials and portal listings September 2026. Completion targets are developer-provided and subject to construction slippage of 6-18 months. Confirm current unit-by-unit availability with a Penang-licensed conveyancing lawyer before signing.

Frequently Asked Questions

How many new-launch and upcoming projects does Penang have in the 2026-2030 window?

+

As of September 2026, I follow 89 projects across Penang Island and the mainland with confirmed completion between 2026 and 2030 (plus a handful with completion yet to be announced). The 2026 tranche is the largest at 25 projects, followed by 2028 with 24 and 2027 with 21. Coverage tapers sharply from 2029 onward because those launches are still opening for registration.

What is the cheapest upcoming Penang project in this window?

+

On the island, The Skyline in Paya Terubong has the lowest entry price in this window, from RM199,900 for its affordable-housing units (target 2028), which are sold under the state scheme with income limits and resale restrictions. On the mainland, the cheapest entries include Juru Hills (from RM248,000), Grains Residences in Bukit Mertajam (from about RM283,500) and Ion Vivace at Batu Kawan (from RM308,000). Some of these are commercial-title serviced apartments, which come with a different loan margin and running costs from residential-title homes.

What is the most expensive upcoming Penang project?

+

Jesselton Courtyard at Penang Turf Club currently lists its villas from about RM3,322,000, with villas and zero-lot bungalows of 2,734-9,053 sqft — the highest-ticket upcoming project by entry price. Cantonment Residence in Pulau Tikus (from RM2,600,000) and W Residence Gurney Bay (from RM2,370,000) sit in the same top tier.

Which upcoming project has the most units?

+

SkyWorld PearlMont in Seberang Jaya leads the pipeline at 1,846 units (target 2029), followed by SENZE @ PICC in Bayan Lepas at 1,680 units (2027) and Maldives Residences also in Bayan Lepas at 1,665 units (2027). Volume products cluster in Bayan Lepas and Batu Kawan, not the northern Penang Island premium areas.

Which are the standout upcoming projects for foreign buyers?

+

Foreign buyers need to clear the RM1M Penang Island floor. The 2026-2030 pipeline includes W Residence Gurney Bay (RM2.37M), Lightwater Residences (RM2.05M), Waterstone Tanjung Bungah (RM1.29M), Merione Residences (RM1.58M), Lumina Residence (RM1.03M), Cantonment Residence (RM2.6M), and Jesselton Courtyard (about RM3.32M) — all foreign-eligible from entry. For MM2H Gold's RM1M property leg, Lumina and Merione are the two efficient minimum-stretch options.

How reliable is a 2029 or 2030 completion date on a Penang new launch?

+

Malaysian construction runs 3-4 years on strata towers, and completion slippage of 6-18 months is normal. A '2029 target' from a developer today usually delivers 2029-2030 in practice; a '2030 target' can slip to 2031. Model your own timeline with a 12-month buffer, especially for taller towers and integrated-precinct projects.