GSD Land Sdn Bhd
D'Hazelton @ Farlim
Jalan Bukit Kukus, Paya Terubong / Ayer Itam
From
RM 450K
RM 450– PSF · Completion 2029
Tenure
freehold
Title
TBC
Total Units
99
Completion
2029
- From
- RM 450K
- PSF
- RM 450
- Tenure
- freehold
- Total units
- 99
- Status
- selling
- Completion
- 2029
Project Tracking
We're tracking D'Hazelton @ Farlim — not yet personally reviewed by Zac
This project is in our database from public sources (5 sources) from GSD Land Sdn Bhd. Full pricing, floor plans, unit availability and Zac's honest take are available on direct request — most developers update pricing weekly and we share the current numbers immediately.
- 📋 Latest price list & available unit types
- 🏗️ Current construction stage and photos
- 💬 Zac's honest assessment for your situation
- 📞 Direct introduction to the developer if you want to view
D'Hazelton @ Farlim unit types
| Type | Config | Size (sqft) | Units | Car parks |
|---|---|---|---|---|
| 3BR | 3BR | 900–950 | — | — |
| 4BR | 4BR | 950–1,000 | — | — |
| Total | — | |||
Building specifications
- Blocks
- 2
- Floors
- 35
- Total units
- 99
Facilities
What's nearby
🏥 Healthcare
- Gleneagles Medical Centre Penang5.0km
🎓 Schools
- SMK Paya Terubong1.5km
🛍 Shopping
- Sunshine Farlim Hypermarket300m
- Econsave Farlim500m
Monthly Instalment Calculator
Monthly Instalment
RM 1,818
Total Interest
RM 358,397
Total Outlay
RM 808,397
Farlim — area snapshot
Active projects
0
selling or under construction
Subsale condos
0
completed projects
Total tracked
1
properties in this area
Total Cost Breakdown
Every cost you'll pay — stamp duty, legal fees, loan documentation, foreign levy. Real Penang numbers, not generic Malaysia estimates.
| Downpayment | RM 45,000 |
| SPA stamp duty | RM 8,000 |
| SPA legal fee | RM 5,625 |
| MOT stamp duty (at VP) Tiered 1–4% on transfer value. Paid at Vacant Possession stage. Buyer's cost — rarely absorbed by developer. | RM 8,000 |
| Loan stamp duty (0.5%) | RM 2,025 |
| Loan agreement legal fee | RM 2,025 |
| Valuation fee | RM 1,000 |
| Search, admin, misc | RM 1,000 |
| Gross upfront total | RM 72,675 |
New launch — typical developer savings
Toggle what the developer is absorbing. Confirm the actual package before signing.
Net upfront (after savings)
Based on typical 2026 new launch package
Estimates based on 2026 Penang state rules. Actual costs vary by bank, lawyer, and case complexity. Confirm exact figures with Zac →
Frequently asked questions
How much is D'Hazelton @ Farlim?
+
Is D'Hazelton @ Farlim freehold or leasehold?
+
When is the expected completion / VP?
+
Who is the developer of D'Hazelton @ Farlim?
+
From
RM 450K
D'Hazelton @ Farlim